The BAM Nuttall, Morgan Sindall, Balfour Beatty JV is constructing the 7km west section of the 25km Thames Tideway Tunnel. This section of the ‘super sewer’ will run from Acton in West London to Fulham in South West London incorporating seven separate work sites along the route.
This project follows on from BAM’s previous use of BC, specifically on the BAM, Ferrovial, Kier (BFK) joint venture work on various Crossrail tunnels.
They required an easy to use solution to manage the ‘000s of documents, drawings and information generated on a major project.